Difference between revisions of "Vent"

From RimWorld Wiki
Jump to navigation Jump to search
m (The Vent can indeed have any building in front of it and work normally, but no walls)
Line 18: Line 18:
 
| material name = Steel
 
| material name = Steel
 
}}
 
}}
{{Info|A '''vent''' conducts some of the [[temperature]] from one room to another room. It structurally acts like a wall to separate rooms and it supports a roof. Placement of a vent requires open space on its two sides -no walls, you can place any building though-. The blueprint can be laid atop an existing wall; the wall is replaced upon construction. The placement of multiple vents along a wall increases the temperate transference.}}
+
{{Info|A '''vent''' conducts some of the [[temperature]] from one room to another room. It structurally acts like a wall to separate rooms and it supports a roof. Placement of a vent requires open space on its two sides (no solid structures such as walls). The blueprint can be laid atop an existing wall; the wall is replaced upon construction. The placement of multiple vents along a wall increases the temperate transference.}}
  
 
In Alpha 17 they can be opened and closed with a simple flick action.
 
In Alpha 17 they can be opened and closed with a simple flick action.

Revision as of 04:23, 14 October 2017

Basics Menus Game Creation Gameplay Pawns Plants Resources Gear Mods
Menus Architect Work Schedule Assign Animals Wildlife Research Quests World History Factions Menu
Architect Menu Orders Zone Structure Production Furniture Power Security Misc Floors Recreation Ship Temperature Special Ideology (Buildings) Biotech (Buildings)

Vent

Vent

A simple vent for equalizing the temperature between two rooms without allowing people to walk between them.

Base Stats

Type
Temperature
HP
100
Flammability
100%

Building

Size
1
Placeable
Yes

A vent conducts some of the temperature from one room to another room. It structurally acts like a wall to separate rooms and it supports a roof. Placement of a vent requires open space on its two sides (no solid structures such as walls). The blueprint can be laid atop an existing wall; the wall is replaced upon construction. The placement of multiple vents along a wall increases the temperate transference.

In Alpha 17 they can be opened and closed with a simple flick action.