Topic on User talk:Vilobion

Jump to navigation Jump to search

"11.5 day cycle" is simply incorrect.

If you recharge a mech from 5% to 100%, then you'd be recharging for (.95 * 48) = 45.6 hours. The whole thing would be an 11.4 day cycle, and would not produce a full set of wastepacks, as I understand the wastepack mechanic. If you really want to use the 5-100 cycle, then at least update the wastepack production numbers accordingly.

Using whole numbers is easier to understand and read. With extended mech use, every setting should provide the same work:wastepack ratio, minus travel time (which is ignored, intentionally so). "Every 12 days of work time produces 5 wastepacks" would be a correct statement regardless of default settings.